Individual Plot - A4 - 166,000€
Phase 1 - Plots
- A1A 2 Bed Townhouse 166,000€
- A1B 2 Bed Townhouse 166,000€
- A2 2 Bed Townhouse 166,000€
- A3 2 Bed Townhouse 162,000€
- A4 2 Bed Townhouse 166,000€
- B1 3 Bed Townhouse 240,000€
- B2 - Reserved
- B3 - Reserved
- C1 - Reserved
- D1 2 Bed Townhouse 182,000€
- D1 Retail (Shop) 66,000€
- G1A - Sold
- G1B - Sold
- G2A 1 Bed Apartment 98,000€
- G2B 1 Bed Apartment 98,000€
Plot A4 2 Bedroom Townhouse
This beautiful 2 bedroom townhouse is available for only 166,000€. It comes complete with window rejas, air conditioning units fitted to the living room and master bedroom, traditional Andalucian chimney with wood burning cassette. It also includes a satellite system, installed communally that allows you to connect to TV, Internet and telephone. Free access to communal pools also included.
Ground Floor
Terrace: 9' x 5' (2.75 x 1.50)
Entrance Hall
Cloak Room
Lounge: 16' x 15' (max) (5.00 x 4.60)
Kitchen: 16' x 12' (5.00 x 3.65)
First Floor
Bedroom 1: 16' x 12'6 (max) (5.00 x 3.60)
Built in Wardrobe
En-Suite Shower
Balcony: 8' x 5' (2.60 x 1.50)
Bedroom 2: 12' x 11'6 (max) (3.65 x 3.50)
Built in Wardrobe
En-Suite Shower
Balcony: 6'6 x 2' (2.00 x 0.06)
These plans are not intended to constitute any part of a contract. The information contained hereon is subject to planning authority requirements and architectural, technical and size changes may well occur.
Sub-Navigation
Development Phases
Phase 1
Main village square. Construction of 14 dwellings around main plaza and 1 retail unit. Due for completion approximately 12 –18 months after start date. (Start date of Sept 2005).
Phase 2
6 detached houses due for completion March 2007.
Phase 3 & 4
Will include green areas and swimming pools with parking for all residents. Also garages will be available to buy on a first come first serve basis. Commencement of these phases will take place at the end of 2006, early 2007.
Hotel and Restaurant
Swimming pool for resident use and outside bar/restaurant area will be completed at the end of 2005. The hotel and indoor restaurant area will be completed towards the middle of 2007.